Silk Mermaid > The big molds (3): Opening

The big molds (3): Opening

Posted by Allen | Technique | Sunday 11 January 2009 6:11 pm
The big molds (3): Opening

Three things today: cutting the legs to length, removing the bolts, and opening the shells. We used a contractor’s laser level to sight down the legs, then cut them off with a SawzAll. We then carefully removed the bolts from all the pieces — this took hours!

Near the end of the day, we used a few dozen screwdrivers to remove the first few shells. You can see them after the jump.

bigmolds09

As you can see, once a shell is off, it sits correctly on the floor and connects seamlessly with the other shells.

A very rewarding day.