Timeline
For the technical folks out there, here is the timeline so far:
- Two days to build the maquette.
- One day to make cross sections off the maquette and transfer them to acetate.
- One day to steal cardboard from dumpsters around town. I need the big stuff without seams.
- One day to transfer sections from acetate to cardboard.
- Two days to design the steel armature and buy steel.
- Two days to weld the base.
- One day to glue the sections together and move them to the welding studio.
- Half a day to mount the cardboard cross-sections to the base.
- Four days to weld the rest of the body (as shown in the next posts).
Total so far: two weeks, plus a half day.